Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Comet, C (2009) Social capital and profits of small firms in the French construction industry. Construction Management and Economics, 27(04), 411–8.

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(04), 385–98.

Li, H, Lu, W and Huang, T (2009) Rethinking project management and exploring virtual design and construction as a potential solution. Construction Management and Economics, 27(04), 363–71.

Lingard, H C, Cooke, T and Blismas, N (2009) Group-level safety climate in the Australian construction industry: within-group homogeneity and between-group differences in road construction and maintenance. Construction Management and Economics, 27(04), 419–32.

Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(04), 331–42.

  • Type: Journal Article
  • Keywords: concession; negotiation; real option; public-private partnerships; private finance initiative
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190902807071
  • Abstract:
    Over the past two decades, many developing countries have grown to become more familiar with the notions and the use of public–private partnership/private financing initiative (PPP/PFI) schemes in building large-scale infrastructure assets. However, owing to higher levels of complexity and longer contractual durations, PPP/PFI projects are often embedded with higher risks. On the one hand, any private sector concessionaire would strive to secure some forms of subsidies or guarantees from the host government to alleviate its risk concerns. On the other hand, the host government would also attempt to counterbalance the grant of these incentives by introducing additional ‘repayment’ obligations, such as placement of a cap on the tariff or toll rates. Modelled as real options, support and repayment features found in the case of a wastewater treatment plant in Southern China are evaluated using a combination of Monte Carlo simulation and spreadsheet-based cash flow models. The objective is to illustrate how a negotiation band incorporating these option values can be constructed, which would enlarge the feasible bargaining range for both parties. The risk implications of two disparate bidding scenarios found in the case will also be discussed.

Manoliadis, O G, Pantouvakis, J-P and Christodoulou, S E (2009) Improving qualifications-based selection by use of the fuzzy Delphi method. Construction Management and Economics, 27(04), 373–84.

Smyth, H and Fitch, T (2009) Application of relationship marketing and management: a large contractor case study. Construction Management and Economics, 27(04), 399–410.

Tone, K, Skitmore, M and Wong, J K W (2009) An investigation of the impact of cross-cultural communication on the management of construction projects in Samoa. Construction Management and Economics, 27(04), 343–61.